home / about NOPSA
search
vision, mission, objectives
history of NOPSA
corporate
cost recovery
media
feedback
contacts
national programmes
projects
legislation & regulations
for operators
reporting incidents
safety cases
inspections
diving
occ health
alerts
policies
guidance
forms
presentations
for HSR's
key performance indicators
continuous improvement
employment
NOPSA Board
memoranda of understanding
privacy, copyright, disclaimer, technology
CEO's Newsletter
links

Guidance Note TitleSupporting Safety Studies
Principal AudienceThis guidance note forms part of a suite of five guidance notes which are designed to help operators through the process of conducting a formal safety assessment in support of the evidence that risks are reduced to a level that is ALARP. These guidance notes will be of use to those with responsibility for planning and developing the facility safety case, and those involved in ongoing risk management through operations and maintenance of control measure performance standards. This suite comprises the following documents:
  • Hazard Identification
  • Supporting Safety Studies
  • Risk Assessment
  • ALARP
  • Control Measures and Performance Standards
     
Core Concepts
  • There is a direct requirement in MoSOF for a fire and explosion risk analysis, and for an EER analysis.
  • The hierarchical approach of risk management should be followed; studies should not concentrate on mitigation measures alone
  • The regulations require that the risks are reduced to ALARP thus the supporting safety studies should not simply assume that industry codes and standards are suitable by default.
  • The demonstrations and evidence required to be in the safety case impose a requirement for transparent and auditable processes for all studies that support the safety case
  • The supporting safety studies should cover the full range of identified MAEs and not simply limited to those that are covered by the specific design of the facility
Current StatusNOPSA to draft initial document
Next StepNOPSA to finalise draft
TimingPlanned for open consultation Q1 2010
Consultation ProcessInitial draft by NOPSA with technical guidance provided by sample industry group, followed by open consultation via discussion paper on website. Workshop with interested stakeholders planned for Q1 2010
Draft Document for ConsultationAwaiting draft.
Comments TemplateAwaiting draft.